The project was completed to our satisfaction, on time and with no cost variations. The site was kept clean and tidy throughout.
Installation of Piles and Groundbeams
Saturday, May 14th, 2016 AT 12:03PM
- Location: Sturry Road, Canterbury
- Author: Phil – Abbott Construction