U&M Group
Image of kitchen 2 after

Escape of Water – Battle

Thursday, November 30th, 2017 AT 03:47PM

  • Type of work: Escape of Water - Long standing leak on water pipe.
  • Location: Battle, Kent
  • Duration: 4 months
  • Value: £35,000.00

Kitchen 2 afterKitchen 2 beforeBathroom after Bathroom Before Hall after hall before Kitchen 1 afterKitchen 1 before

 

The property was completely stripped out back to the beam and block floor structure and blockwork walls. The internal partition walls were removed and reconstructed.

All electrical and plumbing services were renewed together with kitchen and bathroom.

The property was fully replastered and redecorated with new floor coverings and heating system.

Lounge after Lounge before