Contiguous piled retaining wall

Monday, July 13th, 2015 AT 09:58AM

  • Type of work: Retaining
  • Location: Rye, East Sussex
  • Duration: 6 Months
  • Ground conditions: Clay

Rye, East Sussex

The adjacent retained land had suffered surface slippage and fallen against the flank wall of the timber framed bungalow.

Rye - before Rye 2

Piling mat formed using stone filled gabions. Contiguous piles then installed using 40 no. 350mm diameter board piles x 6m deep using a 1.0 tonne Super Kitten piling rig.

Rye 3Rye 4

Once the piles had cured the ground in front of the piled was excavated and a new RC retaining wall & integral capping beam was formed. Once complete, the wall was rendered and ground backfilled and regraded behind the RC wall.

Rye 5Rye 7.2

The project took 6 months to complete within programme and budget.